Projects
Works involved maintenance blast cleaning, hand tool cleaning, manual brush/ roller painting and airless spray painting of various storage tanks, heaters, chimneys, columns, piping, steel structures, etc., and installing and removing of scaffolding for the same.
- Pneumatic abrasive blast cleaning to SA2.5
- Roller, Brush & Airless spray painting
- Steel scaffold installation
Works involved maintenance blast cleaning, hand tool cleaning, manual brush/ roller painting and airless spray painting of various storage tanks, ladle shop structure, chimneys, piping, steel structures, etc., and installing and removing of scaffolding for the same. Refurbishment of silo steel structure inclusive of fabrication, sheeting and painting.
- Steel scaffold access to the storage tanks, chimneys, building structures and walkways.
- High pressure water washing
- Manual chipping, wire brush & emery surface preparation to ST 2
- Spray, Roller & Brush painting
- Steel fabrication
- Gas cutting and Removal of old scrap steel
- GI and AC Sheeting to roof and fascia
Works involved surface preparation for specialized coating of underground seawater intake – circulation pipes (3.75M dia ) and cooling towers floors.
- Pneumatic Chipping & removal of damaged glass flake epoxy coating
- Pneumatic abrasive blast cleaning to SA2.5
- Steel scaffold installation & tarpaulin enclosures
- 24 hour round the clock shutdown work.
Works involved surface preparation and painting of new ships, scaffolding installation & dismantling including tarpaulin enclosures, housekeeping and final clean of ships.
- High pressure water washing
- Manual chipping & power tool surface preparation to ST & ST3
- Pneumatic abrasive blast cleaning to SA2.5
- Roller, Brush & Airless spray painting
- Steel scaffold installation & tarpaulin enclosures.
- Ship housekeeping to avoid fire hazards and rainwater cleanups
- Final clean of bridge and accommodation blocks of ships prior to handover.
Works involved surface cleaning and epoxy painting of civil structures.
- Pneumatic blast cleaning of concrete structures.
- Airless spray cold tar epoxy painting
Works involved turnkey shifting of plant, machinery & materials (Approx 1000T) from one yard to another.
- Planning & coordination
- Rigging, Derigging & loading
- Craneage & trailer transportation
- Unloading and Placement in designated location
Works involved blast cleaning and epoxy painting of fabricated heavy steel structures(Approx 5000T) and onsite painting of erected steel structures.
- High pressure water washing
- Pneumatic abrasive blast cleaning to SA2.5
- Roller, Brush & Airless spray painting
- Steel scaffold installation & tarpaulin enclosures.
Works involved surface preparation, painting of new ships and maintenance painting of shipyard tug boats.
- High pressure water washing
- Manual chipping & power tool surface preparation to ST2 & ST3
- Pneumatic abrasive blast cleaning to SA2.5
- Roller, Brush & Airless spray painting.
Works involved surface preparation and painting of complete boat.
- High pressure water washing
- Manual Chipping & power tool surface preparation to ST2 & ST3
- Pneumatic abrasive blast cleaning to SA2.5
- Roller, Brush & Airless spray painting.
Works involved blast cleaning and epicoat airless spray painting of internal surface of tank.
- Pneumatic abrasive blast cleaning to SA2.5
- Manual Chipping & power tool surface preparation
- Airless spray epoxy painting.